Complete refurbishment of an existing ground + three floors building.

Asbestos removal and gutting. All technical equipment replaced including lift. Additional emergency staircase created onto the garden.

Façades replaced with a mixed glass and stapled stone curtain wall. Heat recovery air-conditioning by direct regulation (Daikin VRV (Variable Refrigerant Temperature)).

Indoor open space layout.

  • Project owner: MIPA 3
  • Net surface area: 2.500 m2
  • Duration: 16 months (2009-2010)
  • Architect: ALEXANDRE et AVELINE Agency
  • Works budget €3.3M. VAT in 16 separate work items