Major refurbishment of a 1970s office building at the heart of Boulogne Billancourt, creating an upper floor above a building structure.
Gutting and asbestos removal. Transformation of all the façades by applying outside insulation under lacquered metal sheets and glazed curtain walls under thermal break profile. High-performance technical equipment.
Open space layout on landings.
The entire structure obtaining the highly efficient HQE and BBC (low carbon building) labels.
Wide landscaped area around the site.
- Project owner: AXE PROMOTION – MONCEAU
- Net surface area 6.800 m2 in separate trades (sixteen work items)
- Duration: 18 months (2011-2013)
- Architect: M.P. et A Agency
- Works budget all trades €13M excl.
Do you have a project?
You envision buildings and you require construction to be worthy of this vision. Since 1997, ACTEBA has been supporting its clients by providing them with financial and technical expertise for a wide range of projects, both public and private, of varying volumes and complexity.