Major refurbishment of a 1970s office building at the heart of Boulogne Billancourt, creating an upper floor above a building structure.

Gutting and asbestos removal. Transformation of all the façades by applying outside insulation under lacquered metal sheets and glazed curtain walls under thermal break profile. High-performance technical equipment.

Open space layout on landings.

The entire structure obtaining the highly efficient HQE and BBC (low carbon building) labels.

Wide landscaped area around the site.

  • Project owner: AXE PROMOTION – MONCEAU
  • Net surface area 6.800 m2 in separate trades (sixteen work items)
  • Duration: 18 months (2011-2013)
  • Architect: M.P. et A Agency
  • Works budget all trades €13M excl.