At Chevilly-Larue, in the inner Paris suburbs, construction of two HQE- and THPE-certified buildings (high environmental quality and very high energy performance).

Reinforced concrete structure on six floors. Façades with external insulation under brick cladding and aluminium frame with thermal break. Indoor open space layout. Precautionary measures for the installation of a future company restaurant. Ten lifts. Heat recovery air-conditioning and heating and AHU in the roof. Computerised centralised technical building management.

  • Project owner: AXIM – MONCEAU
  • Net surface area: 14,000 m2
  • Duration: 20 months (2009-2010)
  • Architect: Hubert GODET
  • Works budget all trades €24M excl. VAT in nineteen separate work items

Do you have a project?

You envision buildings and you require construction to be worthy of this vision. Since 1997, ACTEBA has been supporting its clients by providing them with financial and technical expertise for a wide range of projects, both public and private, of varying volumes and complexity.